[Getconnected] Justice Center, drainage work to affect Downtown traffic

getconnected at bryantx.gov getconnected at bryantx.gov
Wed Mar 7 22:43:34 CST 2007


Justice Center, drainage work to affect Downtown traffic
 
Two separate, downtown-area construction projects will alter traffic
flow until next week.
 
A stretch of the outside eastbound lane of East 29th Street, near the
Bryan Municipal Office Building, is closed until March 14 to allow
sidewalk removal and driveway installation related to the Justice Center
<http://www.bryantx.gov/departments/index.html?name=police_jccam>
project.
 
Meanwhile, the intersection of 26th and Polk streets is closed to
eastbound and westbound traffic through early next week while drainage
improvements <http://www.bryantx.gov/departments/?name=polk_drainage>
are being performed.
 
Questions? Contact Engineering Services at 979.209.5030.
 
-30-

 

Jay G. Socol
Public Information Officer
City of Bryan, Texas
P.O. Box 1000
Bryan, Texas 77805-1000
(979) 209-5120 (o) - (979) 229-1060 (c)
(979) 228-2437 (pgr) - (979) 209-5107 (f)

www.bryantx.gov <http://www.bryantx.gov/>  
 
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://listserv.bryantx.gov/pipermail/getconnected/attachments/20070307/e7c39eef/attachment.htm


More information about the Getconnected mailing list